Pdf – Installation on BMW R1100RT

Pdf – Installation on BMW R1100RT

Once again the instruction installation on BMW. The variation of product installation make the vehicle much better than original. This is one of the installation for BMW R1100RT as follow:

1. Check the contents of the FUEL Plus kit.
2. Remove panels for access.
3. Run the wiring.
4. Connect the wiring to motorcycle and Junction Board.
5. Mount the display and run its wire to the Junction Board.
6. Power up FUEL Plus, set the clock, and check signals.
7. Replace the panels.
8. Setting parameters. 1. Packing list 9 Display enclosure 64? 9 1, 28? power cable 9 5, lg. cable ties 9 L 9 R Handlebar mount 9 1, 18? black 9 8, sm. ” 9 Junction Board & sleeve 9 1, 4? black 9 3, red T taps 9 16 pin terminal strip 9 1, 16? blue 9 Self fusing tape 1/4X2? 9 Operators manual9 Speed sensor, adhesive, bkt. Temperature sensors 9 air 9 engine 9 other

NOTE: The T tap has dielectric grease inside to protect the connection from moisture. Place the wire across the two U slots and close…

more reference :

2000 BMW R1100RT operators instructions (2),